National

TEPCO: Results of Nuclide Analyses of Radioactive Materials In Air at Site of Fukushima Daiichi Nuclear Power Station


JAPAN—(ENEWSPF)—28 March 2011.  The following information is reported by the Toyko Electric Power Company (TEPCO).

On March 22nd 2011, as part of monitoring activity of the surrounding environment, we conducted nuclide analysis of radioactive materials contained in the air which were collected on March 20th and 21st 2011 at the site of Fukushima Daiichi Nuclear Power Station, which was damaged by Tohoku-Chihou-Taiheiyo-Oki Earthquake. As a result, radioactive materials were detected as shown in the attachment.  Therefore, we summarized the results and reported them to Nuclear and Industry Safety Agency as well as to the government of Fukushima Prefecture today. (previously announced) 

On March 27th, 2011, we conducted nuclide analysis of radioactive materials contained in the air which were collected on the same date at the site of Fukushima Daiichi Nuclear Power Station. As a result, radioactive materials were detected as shown in the attachment. Therefore, we summarized the results and reported them to Nuclear and Industry Safety Agency as well as to the government of Fukushima Prefecture today. 

We will continue the sampling survey the same as this one.

 

 

attachment1:   The result of the nuclide analysis of radioactive materials in the

air at the site of Fukushima Daiichi Nuclear Power Station(PDF 33.9KB)

 

attachment2:   The result of the nuclide analysis of radioactive materials in the

air at the site of Fukushima Daini Nuclear Power Station(PDF 34.9KB)

 

attachment3:   Nuclide analysis of radioactive materials in the air

Fukushima Daiichi Nuclear Power Station(MP-1)(Main Gate)(PDF 34.1KB)

 

attachment4:   Nuclide analysis of radioactive materials in the air

Fukushima Daini Nuclear Power Station(PDF 34.0KB)

 

Source: tepco.co.jp

 


ARCHIVES